Industrial Founded Projects

 

[1] “Transmission Losses Reduction Using Phase Shifting Transformers with Load Balancing in Parallel Lines”, Tehran Regional Electric Company, Ministry of Energy, Iran, 1998-2000 (Project Manager)

 

[2] “Optimization of Electrical Energy Consumption in Auxiliary Service System of Steam Power Plants”, NIROO Research Institute, Ministry of Energy, Iran, 1998-2000 (Project Manager).

 

[3] “ Electrical Lab. Planning for Power Plants”, NIROO Research Institute, Ministry of Energy, Iran, 2000-2001 (Project consultant).

 

[4] “National and Optimal Design of Auxiliary Service Systems for Iran’s Steam Power Plants”, NIROO Research Institute, Ministry of Energy, Iran, 2000-2002 (Project Manager).

 

[5] “Technical and Economical Evaluation of Different Flow Control Methods of Power Plants Electro-pumps, Basic Studies”, NIROO Research Institute, Ministry of Energy, 2001-2001 (Project consultant).

 

[6] “PST Locating in Iranian Transmission System for Transmission Losses Reduction Under Off-peak Steady State Condition”, Tehran Regional Electric Company, Ministry of Energy, Iran, 2000-2002 (Project Manager).

 

[7] “Comparison of Custom Power Devices Considering Tehran Distribution System Specifications”, Tehran Regional Electric Company, Ministry of Energy, Iran, 2002-2003 (Project Manager).

 

[8] “Determination of Important Indexes for X7 Body Shop, Power Quality Point of View”, Iran-Khodro Company, Industries Ministry, Iran, 2002 (Project Manager).

 

[9] “Reduction of Electrical Energy Consumption in Auxiliary Service System of Bisotoon Steam Power Plants”, Gharb Regional Electric Company, Ministry of Energy, Iran, 2002-2003 (Project consultant).

 

[10] “Study on Voltage Problems of Yazd1 and Yazd2 Buses and Suggestion of Improvement methods”, Yazd Regional Electric Company, Ministry of Energy, Iran, 2002 (Project Manager).

 

[11] “Best Design of Parallel Disks of High Current Transformer Winding, Considering  Current Distribution in Parallel Disks”, Research Deputy of Amirkabir University of Technology, Tehran, Iran, 2002 (Project Manager).

 

[12] “Diversity Management for Different Flow Control Methods of Power Plants Pumps and Fans”, Tavanir Company, Ministry of Energy, 2004-2006 (Project consultant).

 

[13] “PST Locating in Transmission System, Considering Normal and Contingency Operation Conditions”, Tehran Regional Electric Company, Ministry of Energy, Iran, 2004-2006, (Project Manager).

 

[14] “Feasibility Study of On-line Measurement of Transformer Winding Displacement Using UHF waves”, Iranian Research Organization for Science and Technology, Ministry of Science Research and Technology, Iran, 2005 (Project Manager).

 

[15] “Feasibility, Technical and Economic Study of Amorphous Distribution Transformer Production in Iran”, Tavanir Co., Ministry of Energy, Iran, 2005 (Project consultant)

 

[16] “Short Cable Application Impact on Power Transformer Transients”, Tavanir Company, Ministry of Energy, Iran, 2005 (Project Manager)

 

[17] “AUT Internship Research Projects”, Iran Khodro Co., Iran, Industries Ministry, Iran, 2005 (Project Manager)

 

[18] Consulting in the Field of Secure Operation of Iranian Power Systems, Iran Grid Management Company (IGMC), Ministry of Energy, Iran 2005-2010 (Project Manager)

 

[19] “AUT Small Business Development Center (SBDC) Establishment”, Iranian Industries Development and Renovation Organization (IMIDRO), Industries Ministry, Iran, 2006 (Project Manager)

 

[20] “Feasibility Study of PST application on Dogonbadan-Kazeroon-Malekmakan Transmission Linel”, Iran Grid Management Company (IGMC), Ministry of Energy, Iran, 2007-2008 (Project Manager)

 

[21] “Determination of Strategic Sub-Regions of Transmission and Sub-Transmission Network of Tehran Regional  Electric Company in order to Limit the Short Circuit Current Level”, Iran Grid Management Company (IGMC), Ministry of Energy, Iran, 2009 (Project Manager)

 

[22] “CHP-DG Development Studies for Power Sources Greater Than 1MW”, Iran Energy Efficiency Organization (IEEO - SABA), Ministry of Energy, Iran, 2010 (Project Manager)

 

[23] "Measurement of Radial Deformation and Axial Displacement of Transformer Winging On Prototype Using Electromagnetic Waves", Tehran Regional Electric Company (TREC), Ministry of Energy, Iran, 2009-2011 (Project Manager).

 

[24] "Transmission System Transients Studies of Hormozgan Regional Electric Company ", Hormozgan Regional Electric Company (HREC), Ministry of Energy, Iran, 2009-2011 (Project Manager).

 

[25] "Techno-Economical Studies of HVDC System for Iranian Transmission System", Iran Grid Management Company (IGMC), Ministry of Energy, Iran, 2010-2012 (Project Manager).

 

[26] "Research on Azarbayjan and Ayat Substations Transients and Suggestion of Solutions to Reduce Side-Effects on Transformers and Solution Extending for Substations of Tehran Regional Electric Company (TREC)", Tehran Regional Electric Company (TREC), Ministry of Energy, Iran, 2011-2013 (Project Manager).

 

[27] "Simulation Studies of Protection System of Kaveh Substation in Steady State and Transient Conditions and Suggestion of Solutions to Improve Protection System of Existing 20/63kV Kaveh Substation after Connection of 2x25MVA DGs", Hormozgan Regional Electric Company (HREC), Ministry of Energy, Iran, 2011-2012 (Project Manager).

 

[28] “Design and Construction of Grid-Connected 3kW Wind Turbine Simulator Coupled to AEPMSC Generator”, Thermal Power Plants Holding Co., Iran, 2014-2017 (Project Manager)

 

[29] "Design and Prototyping of a Flywheel Energy Storage System for Instantaneous Frequency Control of Power Grid", Tavanir Co., Ministry of Energy, Iran, 2015-2017 (Project Manager)

 

[30] “Modeling of Considerations of Wind Farms Interconnection to Iranian Grid”, Tavanir Co., Ministry of Energy, Iran, 2015-2017 (Project Manager)

 

[31] “Study on Overvoltages Applied to Arc Furnace Transformers Primary Path and RC Filters to Suggest Solution for Their Removal”, Mobarakeh Steel Company, Industries Ministry, Iran, 2014-2017 (Project Manager)

 

[32] "Simultaneous Diagnosis of Mechanical Deformation and Partial Discharge in Power Transformer Winding Using UWB Waves", Tehran Regional Electric Company (TREC), Ministry of Energy, Iran, 2014-2017 (Project Manager).

 

[33] “Design and Implementation of Photovoltaic System Emulator and Its Microgrid Connecting Converters”, Iran’s National Elites Foundation, Vice Presidency of Science and Technology, 2019-2020 (Project Manager)

 

[34] “Design and Implementation of Interfacing Converters of PMSG-based Wind Power Plant Simulator for Connecting to Microgrid”, Iran’s National Elites Foundation, Vice Presidency of Science and Technology, 2020-2021 (Project Manager)

 

[35] “Development and Optimization of Methods for Interpretation of FRA Test Results”, Cofounded by German Science Foundation (DFG) and Iranian National Science Found (INSF), Germany-Iran, 2018-2021 (Project Manager)

 

[36] "Iranian Smart Grid and Prototype Implementation", Science, Research and Technology Council of Iran, Iran, 2012-2021 (AUT Project manager)

 

[37] “Study, Design and Implementation of Smart Microgrid Pilot Lab at AUT Based on Iran Smart Grid Executive Road Map”, Tavanir Co., Ministry of Energy, Iran, 2020-2023 (Project Manager)

 

[38] “Design and Implementation of Integrated Control and Monitoring Software System for DGs and Renewable Power Generation Units in Smart Grid”, Tavanir Co., Ministry of Energy, Iran, 2020-2023 (Project Manager)

 

[39] “Design and Implementation of Battery Energy Storage System Connected to Isolated Microgrid for Frequency Control Contribution”, Iran’s National Elites Foundation, Vice Presidency of Science and Technology, 2021-2022 (Project Manager)

 

[40] “Development of Methods for Determining the Level of Explosibility of Gases and Vapors for Wireless Monitoring Systems Powered by Renewable Energy Sources”, Cofounded by Russian Foundation for Basic Research (RFBR) and Iranian National Science Found (INSF), Russia-Iran, 2021-2023 (Project Manager)

 